How to mount a bathtub

Choose a place for your bathtub and level it in a horizontal position. Connect it with a drain system. Check the caulking. Before walling up make sure the bathtub is protected from being damaged by a bricklayer. Lift the bottom of the bathtub and fill two thirds of the space with sand. Unlike the tubs made of metal, these do not have trestle so they ought to be put into fresh cement the thickness of which is 5 - 6 cm. The “sitting” tubs ought to be secured from beneath and put into cement mixture. This tub shapes its bed according to its shape. After the ground dries you can wall the tub in a traditional way using brick or you can use some polyester mass.