 |
How
to mount a bathtub
Choose
a place for your bathtub and level it in a horizontal position.
Connect it with a drain system. Check the caulking. Before walling
up make sure the bathtub is protected from being damaged by a
bricklayer. Lift the bottom of the bathtub and fill two thirds
of the space with sand. Unlike the tubs made of metal, these do
not have trestle so they ought to be put into fresh cement the
thickness of which is 5 - 6 cm. The sitting tubs ought
to be secured from beneath and put into cement mixture. This tub
shapes its bed according to its shape. After the ground dries
you can wall the tub in a traditional way using brick or you can
use some polyester mass.

|
|